Serving Santa Clara and San Mateo counties
15420 La Mar Dr, Morgan Hill, CA 95037
Paver walkways and steps
Paver Walkways
A paver walkway ties the front door, the driveway and the backyard together as one design. We build front walks, side-yard paths and entries, with paver steps where the grade calls for them.
- Free on-site estimates
- Written quote emailed that evening
- Warranty on materials and workmanship
- Doing this work
- 33 years
- Doing this work
- Licensed and started
- 1993
- Licensed and started
- Completed projects
- 30,000
- Completed projects
- CSLB #681971
- C-61
- CSLB #681971
- Licensed, bonded and insured
- CSLB C-61 #681971
- Since 1993
- 33 years
- 30,000 projects
- Warranty on materials and workmanship
- Written terms before you sign
- 10% senior and military discount
- Free on-site estimates
What and why
Why a paver walkway ties the property together
Most of the decisions on a walk are about the ends. Where it leaves the driveway, where it lands at the door and whether the edges stay flush all decide how it feels to use.
A good entry walk gives a level landing at the door and has no trip edges where pavers meet steps or a planter bed. Done well, the front door, the drive and the backyard stop reading as separate projects.
IPS is licensed, bonded and insured, with interlocking pavers as its specialty, and a walk is often added to a driveway or patio project. Victor supervises every job, and you deal with him from estimate to walkthrough. You can meet Victor before you book.
Where they go
Walkway pavers for front entries and side yards

Front entries
The front entry is the walk people see first. A good one carries foot traffic to the door without trip edges, and often includes a landing or a few steps.

Side-yard paths
A side yard is usually narrow, with a fence on one side and tight access for equipment. A paver path there gives you a clean way to the backyard instead of dirt or a worn strip of lawn.
How it is built
What goes under walkway pavers
A path carries people, not vehicles, so the load is lighter. Even so, drainage and edges decide how long a walk stays level. Without a stable bed, edges lift and low spots collect water.
The base follows the same sequence as every IPS surface: excavation, base rock, geotextile fabric, compaction and sand. Edge restraint keeps the outer pavers from drifting apart, and joint sand locks the field together. The pavers, a flagstone mix or a border detail go on last.
Planned at the on-site estimate
- Where the path starts and ends, at the door, drive or gate
- How wide it should be for the way it is used
- Straight run or a curve that follows the yard
- Border, pattern and color to match the house
- Any change in grade that needs steps

Steps
Paver steps, built as part of the walk
Paver steps are planned with the path, not added afterward. The base is built the same way as the walk, with each rise leveled before the pavers go on.
Where the grade is steep, a block wall beside the steps may be part of the plan.
At the door, Victor checks the landing, how tall each rise should be and how the border carries across, so the steps read as part of the path.
Recent work
Finished paver walkways and paths
From first call to walkthrough
How a paver walkway job runs
- 1
Tell us about the path
Call or use the estimate form on our contact page about a front walk, a side path or steps, and say where it needs to lead. You reach Victor directly.
- 2
On-site estimate
Victor walks the route, measures it and checks access, slope and where the path meets doors, drives and yards.
- 3
Written quote
Victor sends the formal quote by email that evening. No-Surprise Guarantee: what we quote is what you pay.
- 4
Deposit and schedule
You sign and pay a $1,000 deposit. Work usually starts within 1 to 2 weeks of approval, and we install year-round.
- 5
Build
Victor’s crews, supervised by Victor, build the path up layer by layer, then the pavers, border and any steps go in. A portable restroom is on site before we start.
- 6
Cleanup and walkthrough
After cleanup, Victor walks the finished path and every step with you before the final invoice.
Our installations are backed by a warranty on materials and workmanship; Victor goes over the written terms with you before you sign. No-Surprise Guarantee: what we quote is what you pay, and any change goes in a written change order. See the warranty details and every step of our process.
When to add one
Plan the path with the project, or on its own
The most common time is with a new driveway: when the drive is replaced, the entry walk can be rebuilt with it so the two match. Where the route changes grade, steps are planned in at the estimate rather than added later.
A walkway can also be planned on its own, for a worn path or a side-yard route to the gate. We are based in Morgan Hill and build for homeowners in Santa Clara and San Mateo counties (see the service areas page). Call (408) 591-1806 or send a few details to set up an estimate.
Good times to add a walkway
- With a new driveway, so the entry path meets the driveway cleanly and matches it
- When a worn path or bare strip needs a clean surface
- To reach a side yard or backyard gate
Walkway questions
Questions about paver walkways
Can you add a walkway to an existing driveway or patio project?
Do you build paver steps?
Can a walkway handle a sloped yard?
Can the path use a different material from the driveway?
Keep exploring
Related work and next steps
Free on-site estimate
Request your free on‑site estimate
Call (408) 591-1806 and Victor will set a time to see the project. If you would rather write it down, the estimate form is on our contact page.
10% off for seniors and military veterans.
Monday to Friday, 7:00 AM to 4:30 PM. Weekends by appointment. Voicemails returned within about 24 hours.
Talk to Victor
Ask a question or set up your estimate
Call and you reach Victor directly. Voicemails are returned within about 24 hours.
